University of Heidelberg

The CERES TPC

  Assembling the 'hamster cage'

    The inner ground cylinder

    Details of the field cage

    Preparing the TPC to insert a readout chamber module

      (P)reparing and cleaning of readout chambers

  The pad plane with chevron pads and anode wires

    The outer cylinder, right: with cooling lines

  A few front end boards (16 channels + ADC each) mounted, before cabling

       
      The TPC leaves the clean room

    The TPC for testing in the service position near the zone

    In the zone: the TPC docked with the MIR and pushed into the magnet.
MWPC's installed for muon and laser tests

      Cabling in the zone

Webmaster:
IT Department