Phase 3 planning relevant to TPC, status 06.10. - 12.10 preparations of DF support, ITS platform support 4 d align DF with SF 1 d install transfer rails 2 d move TPC to IP 3 d align TPC at IP 4 d align platform and ITS rails 3 d move TPC to parking position ----- 17 d 1 d install ITS platform for ITS rails After beam pipe, ITS assembly 2 d move TPC to IP 1 d engage ITS and TPC 2 d ITS services 1 d transfer load to SSW 2 d fix valve and beam pipe to SSW 1 d remove ITS rails