9:30 HV Boards (15 min) T.Sluijk
9:50 ASDBLR and OTIS Boards (25 min) A.Zwart
10:20 Noise measurements of the ASDBLR board (15 min) B.Hommels
10:40 GOL/Aux Boards and Optical Links (15 min) D.Wiedner
11:00 Mechanical Assembly and Cooling of the FE box (15 min) A.Berkien
11:10 OTIS 1.1 Status and prospects (20 min) U.Trunk
11:45 TELL1 for Outer Tracker (15min) D.Wiedner
12:00 Services:/ Distribution boxes (30min) A.Zwart
------ 12:45 - 13:30 Lunch Break ---------------------
13:30 Grounding and Shielding and Power supplies (20 min) T.Sluijk
14:00 Schedule (10 min) U.Uwer
14:20 Discussion
15:20
Meeting of Reviewers
Overview: Description of the LHCb Outer Tracker Electronics
Front-End Boards:
ASDblr Board Prototype: Description of the ASDblr board
OTIS Board (Version 1.0): Description of the first OTIS board
Auxiliary Board (Prototype): Description of the GOL/Aux Board
Power Dissipation: estimation and measurementOTIS Chip:
OTIS - A TDC chip for the LHCb Outer Tracker (pdf))
Reset Handling (pdf) Describes the types and the handling of the resets of the chip.
Specification of OTIS-to-ASDblr Interface
OTIS 1.1 Reference Manual (pdf)Optical Link:
Auxiliary Board (Prototype): Description of the GOL/Aux Board
Optical 12 Input Receiver (Prototype)
Synchronization of the OT Optical LinksPower Sypply, Grounding, Services:
Grounding and Shielding:
Service and Distribution Box: Describes the distribution of Slow Control, Fast Controll signals, High and
Test Pulse system (preliminary)
.ASDblr Chip (for reference only):
UPenn ATLAS ASDblr page (general)
UPenn ATALS ASDblr page (DMILL results)
ATLAS ASDblr pageLevel-0/1 Specs / TELL1 board (for reference only):
Requirements to the L0 front-end electrocnics
Requirements to the L1 front-end electrocnics
L1 Readout Board (TELL1 Board)Other related documents:
Radiation environment in LHCb